Before: Well, we really don’t have a “before” picture for the master bath. It was the flat roof area (could be called a balcony) above the old back porch and kitchen in the picture below.
During: I’ve already blogged the shower construction
here. And the funky body jet plumbing
here. So just a couple more photos:
Here is the floor tile going in...

And the vanity with a marble top, both from Restoration Hardware.

Medicine cabinet, light fixtures, plumber and niece.
After: Le Spa.
Handheld shower and body jets.

The vanity and sink. Note the frameless medicine cabinet is now surrounded by a frame mounted to the wall. The heat vent is under the vanity, so warm air blows on your feet in the morning.

Another of the dual-flush toilets, this is a bathroom after all…
No comments:
Post a Comment